Sheathing - Part 2

After day 2 of sheathing, our house looked like this:


Front view:


Side view:


Wide view:


Back side view:


Second story: Master bathroom (left), master bedroom (right)
First story: Living room (left), dining room (right)


Living room (left), dining room (right):


Sliding glass doors that lead into the dining room and a chunky patio beam:


Loft:


Loft looking out onto the foyer:


Master bedroom:



Tomorrow I'll be posting a video tour of the house's insulation and a sneak peek at a little something I bought for the house over the weekend!

Sheathing - Part 1

Our house's sheathing went up last week and after day 1, it looked like this:


Front view:


Side view:


Wide view:


Back side view:


Second story: Master bathroom (left), master bedroom (right)
First story: Living room (left), dining room (right)


Living room (left), dining room (right):


Two can lights were installed in the foyer's 20 foot ceiling. Changing those light bulbs should be fun </sarcasm>:


Looking down onto the foyer and staircase:


Looking at the door to the garage (left) and the kitchen (right):


Kitchen (left), dining room (right):



Living room:


The sheathing has been completed and the insulation is done which means this week is drywall week! I'll be posting about day 2's sheathing tomorrow and then I'll have a video tour of the insulation for you on Friday!

Window Wonderland

It's a window wonderland at my house!


Front view:


Wide view:


Side view:


Back view - Master bathroom (left), master bedroom (right):


Dining room (left), living room (right):


Living room windows:


Dining room window:


Dining room windows (left), living room windows (right):



Living room windows:


Looking up at the loft window (left) and master bathroom window (right):


Loft window:


Foyer windows:



Looking down onto the foyer:


Guest bedroom #1's window:


Guest bedroom #2's window:


Master bedroom windows with our nice mountain view:


Master bathroom (left), loft (right):


The electrical work was also added and the house was looking a little crazy:




The outside sheathing is almost done and the drywall is scheduled to go up at the end of next week! I can't wait :)

Hot N Cold

The rest of our plumbing was installed which left the house looking a little something like this:




Plumbing running up to the master bathroom:


Plumbing for the kitchen island's sink and dishwasher:






The guest bathroom's bathtub is in:


Plumbing for the master bathroom's vanity:


The master bathroom's shower:


In order to get the blog caught up to the house's current state, I plan on blogging about the house's electricity tomorrow and the windows on Friday.

On Saturday, I have an appointment to pick out my granite slab (Bianco Antico) and I'm keeping my fingers crossed in hopes that they have two slabs that I like!